Design and Installation of Solar Trees of total capacity 17 kWp at Office and Colony of CSIR-CMERI.
Welcome, Friday , Oct , 31 , 2025 | 23:16 IST
Welcome, Friday , Oct , 31 , 2025 | 23:16 IST
 
				 				 Director CSIR-CMERI Inaugurates Indigenous Surgical Artery Forceps Manufacturing Setup
   Director CSIR-CMERI Inaugurates Indigenous Surgical Artery Forceps Manufacturing Setup    CSIR-CMERI Celebrates 84th CSIR Foundation Day
   CSIR-CMERI Celebrates 84th CSIR Foundation Day    Mob Control Vehicles
   Mob Control Vehicles    Hindi Month 2025: Closing Ceremony & Prize Distribution Celebrated with Enthusiasm and Pride
   Hindi Month 2025: Closing Ceremony & Prize Distribution Celebrated with Enthusiasm and Pride    Together for a Clean Green and Sustainable Environment: #SwachhtaHiSeva 2025
   Together for a Clean Green and Sustainable Environment: #SwachhtaHiSeva 2025   Design and Installation of Solar Trees of total capacity 17 kWp at Office and Colony of CSIR-CMERI.





