Design and Installation of Solar Trees of total capacity 17 kWp at Office and Colony of CSIR-CMERI.
Welcome, Friday , Apr , 10 , 2026 | 18:57 IST
Welcome, Friday , Apr , 10 , 2026 | 18:57 IST
CSIR-AMPRI, Bhopal and CSIR-CMERI, Durgapur shared a visionary roadmap for farmer-centric innovation during the institute’s nationwide outreach
CSIR SMART VILLAGE initiative was inaugurated on March 16, 2026, at Kusunpur village in Kendrapara district, Odisha
The National Symposium on Advanced Functional Coatings & Surface Engineering Technologies (AFCSET-2026) was organized at CSIR-CMERI, Durgapur on March 13–14, 2026
Municipal Solid Waste Segregation Pilot Plant (Click banner to read more)
The flag-off ceremony of the first batch of Beam Stopper BC3, was successfully conducted on March 25, 2026, at Kanpur Design and Installation of Solar Trees of total capacity 17 kWp at Office and Colony of CSIR-CMERI.





