Welcome, Thursday , Dec , 12 , 2019 | 01:43 IST
To map the river bed profile for 20 km stretch and determining Width of water flow, Maximum depth of water, Mean depth of water, Area of water flow, Mean velocity of water, Average Discharge of water, Salinity, Temperature, Turbidity at four sections for continuous four days per season for three...
Duration: 12 March 2019 to 11 March 2020
PI: Dr. Swarup Ranjan Debbarma
Sponsoring Agency: West Bengal Drinking Water Sector Improvement Project; Govt of West Bengal
Development of Solar-Biomass Hybrid Self-sustaining Fish Processing Unit for Livelihood Upliftment of Economically Disadvantaged People of Mizoram
Duration: 5 January 2019 to 4 January 2021
Co PI: Mr. Partha Das
Total Cost: 27.96
Development of Stirrcast heat sink out of Al-Si-MWCNT alloy composite for Thermal management of high power LED’s
Duration: 3 January 2019 to 2 January 2022
Co PI: Dr. Ranajit Ghosh Dr. Chanchal Loha
Total Cost: 68.29
Development of technology for Unmanned Ground Vehicle (UGV) for multipurpose and multirole applications
Duration: 7 March 2019 to 6 March 2022
Co PI: Mr. Sankar Karmakar Mr. Umesh Shrikrishna Patkar
Total Cost: 288.83
Reconfigurable tracked flipper type mobile robot technology with autonomous navigation in indoor environment
Duration: 7 March 2019 to 6 March 2022
PI: Mr. Umesh Shrikrishna Patkar
Co PI: Mr. Abhijit Das Dr. Dip Narayan Ray
Total Cost: 176.07
Rssfeed
Youtube
Twitter
Facebook
Contact Us