Duration: 10 March 2011 to 9 March 2013
Total Cost: 45.54
Duration: 10 March 2011 to 9 March 2014
PI: Dr. Sudipta De
Total Cost: 22.21 Lacs
Duration: 10 March 2011 to 9 March 2014
Co PI: Dr. Sudipta De
Total Cost: 48.95
Main objectives :
Installation of EDX with existing SEM. Installation of Six Components Pyramidal Balance. Installation of WAM Robot.What was achieved : The three instruments as mentioned in the objective are installed and currently functional. The instruments are extensively being...
Duration: 10 March 2011 to 31 March 2014
Total Cost: 211.91119
Duration: 12 January 2011 to 30 November 2013
PI: Dr. Soumen Sen
Co PI: Dr. Sambhunath Nandy
Total Cost: 42.05