Duration: 3 October 2011 to 9 March 2012
Duration: 3 October 2011 to 3 September 2014
PI: Dr. Pabitra Halder
Total Cost: 28.95
Main objectives :
Study the hydrodynamic modeling of the fluidized bed gasifier Modeling the overall performance of the gasifier by integrating the reaction kinetics with fluidized bed hydrodynamicsWhat was achieved :
Duration: 3 October 2011 to 30 September 2013
Total Cost: 12.60
Main objectives : The objective of the project is the flow analysis of complex 3D geometries in order to obtain a superior design of complex engineering components along with optimized shape & size. It will further be subjected to virtual experimentation to measure its performance by...
Duration: 3 October 2011 to 3 September 2014
Total Cost: 96.00 Lacs
Duration: 1 October 2011 to 30 September 2014
PI: Dr. Phani Kumar Mallisetty
Total Cost: 17.68
Sponsoring Agency: CSIR