Design, development and prototyping of state of the art Hybrid Energy Storage System (HESS) based high power high speed Electric Vehicle (EV) drive train for a Multi Utility Vehicle (MUV)
Welcome, Sunday , Jun , 21 , 2026 | 13:16 IST
Welcome, Sunday , Jun , 21 , 2026 | 13:16 IST
The flag-off ceremony of the first batch of Beam Stopper BC3, was successfully conducted on March 25, 2026, at Kanpur
CSIR-AMPRI, Bhopal and CSIR-CMERI, Durgapur shared a visionary roadmap for farmer-centric innovation during the institute’s nationwide outreach
Collaborating for a stronger future Design, development and prototyping of state of the art Hybrid Energy Storage System (HESS) based high power high speed Electric Vehicle (EV) drive train for a Multi Utility Vehicle (MUV)





