Published on
CSIR-Central Mechanical Engineering Research Institute
(
https://www.cmeri.res.in
)
Printer-friendly > Design, Fabrication and Demonstration of Type-IV Hydrogen Storage Tank, Safety Valves and Leak detectors” under Vertical 2 : Hydrogen Storage (HCP-44/02/2)
Design, Fabrication and Demonstration of Type-IV Hydrogen Storage Tank, Safety Valves and Leak detectors” under Vertical 2 : Hydrogen Storage (HCP-44/02/2)
Project Start Date:
01/04/2022
Project Type:
Plan Project
Project Number: HCP-44/02/2 Name of PI:
Anupam Sinha (350)
Project Status:
Ongoing Projects
Five Year Plan: Show in Front: Estimated Cost: Rs. 180 lakh