CSIR-Central Mechanical Engineering Research Institute
Published on CSIR-Central Mechanical Engineering Research Institute (https://www.cmeri.res.in)

Home > Business Project

Business Project

Residual life Assessment of steam generator unit #1 MTPS, DVC

  • Read more about Residual life Assessment of steam generator unit #1 MTPS, DVC

Condition Assessment of RCC foundation & superstructures of selected building/structure through NDT test and recommendation for rectification phase-1 at Budge Budge generation station

  • Read more about Condition Assessment of RCC foundation & superstructures of selected building/structure through NDT test and recommendation for rectification phase-1 at Budge Budge generation station

Installation of 02 nos. of Solar artifacts each 3 kwp capacity at Bidyut Uunayan Bhawan

  • Read more about Installation of 02 nos. of Solar artifacts each 3 kwp capacity at Bidyut Uunayan Bhawan

Post earthquake survey of storage tanks & Non Destructive testing of concrete foundation

  • Read more about Post earthquake survey of storage tanks & Non Destructive testing of concrete foundation

Conduction of Step Draw Down Well Pumping test aquifer performance test and checked for quality of water at two locations in Daskeyari Mouza under Baraboni PS, Asansol Sub-Division

  • Read more about Conduction of Step Draw Down Well Pumping test aquifer performance test and checked for quality of water at two locations in Daskeyari Mouza under Baraboni PS, Asansol Sub-Division

ARC for Vibration Analysis and Dynamic Balancing of CW Pumps

  • Read more about ARC for Vibration Analysis and Dynamic Balancing of CW Pumps

Cold Walk for initial Survey of Coal Hand-ling Plant at Jayant and Dudhichua, Open Cast Project

  • Read more about Cold Walk for initial Survey of Coal Hand-ling Plant at Jayant and Dudhichua, Open Cast Project

Annual contract for Vibration Analysis and Dynamic Balancing of Cooling Water Pumps

  • Read more about Annual contract for Vibration Analysis and Dynamic Balancing of Cooling Water Pumps

RLA of steam generator unit#2&3

  • Read more about RLA of steam generator unit#2&3

Health assessment of process vessel storage vessel, Naphtha tank chimney

  • Read more about Health assessment of process vessel storage vessel, Naphtha tank chimney

Pages

  • « first
  • ‹ previous
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • next ›
  • last »