  • Development of Anaerobic Digesters for biogas production (GAP241412)

    Duration: 18 April 2023 to 16 June 2024

    Total Cost: 23.25 lakh

    Sponsoring Agency: SSSNIBE (MNRE)

  • Design, Engineering, Installation and commissioning of integrated municipal solid waste disposal system (SSP 240912)

    Duration: 29 March 2023 to 31 March 2024

    Total Cost: Rs. 70.80 Lakh

    Sponsoring Agency: CSIR-NIEST

  • Construction of Bio-Gas Project 50 cubic meter with mechanical, electrical, instrumentation items inclusive of storage and utilization of generated bio-gas at khajra gram panchyat under keshiary dev. Block (SSP241512)

    Duration: 5 March 2023 to 4 May 2024

    Total Cost: 32.20 lakh

    Sponsoring Agency: Khajra Gram Panchayat under Keshiary Panchayat Samiti

  • Absorber Agitator Physical Model Test for NNTPP FGD Project (SSP242512)

    Duration: 2 March 2023 to 1 September 2023

    Total Cost: 16.20 lakh

    Sponsoring Agency: Larsen & Toubro Limited

  • Automatic guided weeding tool based on plant geo-positions for organic farming mechanized (GAP 240612)

    Duration: 9 February 2023 to 9 February 2025

    Total Cost: Rs. 24.62 lakh

    Sponsoring Agency: DST