For sponsored/collaborative projects the project cost is estimated based on the following aspects :

Manpower cost for design/development/manufacturing etc.
Equipment and material cost
25% overhead on physical inputs and raw materials
33.33% of the total project cost is considered to be intellectual fees
For sponsored/collaborative projects, technical & modern services, the Service Tax is 10.2%. For Grant-in-Aid projects, manpower cost and intellectual fees are not considered. Projects based on institute funding are exempted from overhead, intellectual fees and service tax.